File #: RES25-4060    Version: 1 Name:
Type: Resolution Status: Consent
File created: 6/12/2025 In control: Village Board
On agenda: 6/18/2025 Final action:
Title: A Resolution Approving Change Order #1 Contract with Abbey Construction for the Stabilization for the North and South Lots at Village Hall Parking Lot Expansion Project
Sponsors: Chris Drey
Attachments: 1. RES 25-4060 Lot Stabilization CO 6.12.25, 2. RES 25-4060 Full Plan View_With Street Base_05.30.2025_Stabilization Area Takeoff (002)
Date Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

title

A Resolution Approving Change Order #1 Contract with Abbey Construction for the Stabilization for the North and South Lots at Village Hall Parking Lot Expansion Project

body

Whereas, the Village of Romeoville (“The Village”) is a municipality in accordance with the Constitution of the State of Illinois of 1970; and,

 

Whereas, Resolution 25-3975 authorized entering into a contract with Abbey Construction for the Village Hall Parking Lot Expansion project change order; and,

 

Whereas, change requests have been received from Abbey Construction for the purpose of the stabilization options for the North and South lots at Romeoville Village Hall; and,

 

Whereas, an increase in the amount of $112,600.00 to the originally authorized amount for Abbey Construction.

 

 

NOW, THEREFORE, BE IT RESOLVED BY THE PRESIDENT AND BOARD OF TRUSTEES FOR THE VILLAGE OF ROMEOVILLE, WILL COUNTY, ILLINOIS, AS FOLLOWS:

 

Section 1:                     Incorporation of Recitals: The foregoing recitals are hereby incorporated into this Resolution as if fully set forth herein.

 

Section 2:                     Adjustment of Contract:The Village of Romeoville approves an increase in the amount of $112,600.00 for the contract with Abbey Construction to cover the costs of the stabilization options for the North and South lots at Romeoville Village Hall in account number 01.08.15.409. Upon the installation of the binder course in the parking lot, the material was not testing to the appropriate density required. The contractor removed the material and upon extensive further investigation and testing from Geocon it was found there is excessive moisture in the aggregate stone subbase. The recommended remedy to achieve a suitable subbase is to perform cement stabilization to the area. This stabilization process is a long term physical and chemical alteration to the base to enhance the physical and engineering properties of the subbase. This change order consists of stabilization options for the North and South lots at Romeoville Village Hall. The total change order amount is $112,600.

 

 

Section 3:                     Repealer: All other Ordinances or parts of ordinances of the Village of Romeoville that are inconsistent with this ordinance are hereby expressly repealed.

 

Section 4:                     Severability: In the event any word, phrase, clause, sentence, paragraph, provision, or section of this Resolution or any portion thereof shall be held to be unconstitutional, unenforceable, or void, the same shall not affect the validity or enforceability of any remaining words, phrases, clauses, sentences, paragraphs, or sections thereof.

 

Section 5:                     Effective Date: The resolution shall take effect after its passage, approval, and publication in pamphlet form, as provided by law.