Skip to main content
Romeoville Banner
File #: RES23-3713    Version: 1 Name:
Type: Resolution Status: Passed
File created: 11/20/2023 In control: Village Board
On agenda: 12/6/2023 Final action: 12/6/2023
Title: PIN#: 11-04-03-400-012-0000 A Resolution Establishing a Development Security for the Public, Stormwater and Erosion Control Improvements at 85 N. Independence (PZC23-011). Romeoville, Illinois
Sponsors: Jon Zabrocki
Attachments: 1. RES23-3713 Romeoville Asphalt Plant - EOPC (Public Improvements) 11-16-2023

title

PIN#: 11-04-03-400-012-0000

 

A Resolution Establishing a Development Security for the Public, Stormwater and Erosion Control Improvements at 85 N. Independence (PZC23-011).

Romeoville, Illinois

body

Whereas, the Village of Romeoville (“The Village”) is a municipality in accordance with the Constitution of the State of Illinois of 1970; and,

 

Whereas, the developer does have the necessary approvals from the Village Board to begin the proposed improvements under the applicable ordinances of the Village; and

 

Whereas, the Developer is requesting the Village establish a financial guarantee for the multiple site improvements with private utilities and various concrete pads at their asphalt plant east of IL 53 at Material Road to cover 125% of the cost for certain improvements, which include those land improvements that will, after completion, be dedicated to the Village of Romeoville, and soil and erosion control measures; and,

 

Whereas, Village Staff has reviewed the Engineer’s Estimate of Probable Construction Cost and recommends the Village Board establish the development security at $4,156.25.

 

NOW, THEREFORE, BE IT RESOLVED BY THE PRESIDENT AND BOARD OF TRUSTEES FOR THE VILLAGE OF ROMEOVILLE, WILL COUNTY, ILLINOIS, AS FOLLOWS:

 

Section 1.                     The Village of Romeoville establishes a development security for the proposed multiple site improvements with private utilities and various concrete pads at their asphalt plant east of IL 53 at Material Road to cover 125% of the cost for certain improvements, which include those land improvements that will, after completion, be dedicated to the Village of Romeoville, and soil and erosion control measures in the amount of $4,156.25.

 

Section 2.                     The Resolution shall be in full force and effect from and after its passage, approval, and publication in pamphlet form, as provided by law.

 

Section 3.                     The recitals herein above set forth are incorporated into this Resolution as of fully set forth herein.